skip to Main Content

PTA plant USA

For a large client we provided loading equipment for the world’s largest PTA factory. The Veenstra Group engineered and produced two telescopic loading systems with a span of 22 meters.

Read more

For a large client we provided loading equipment for the world’s largest PTA factory. The Veenstra Group engineered and produced two telescopic loading systems with a span of 22 meters. Furthermore we provided loading spouts and fluidisation systems in order to guarantee fast loading speed. All according to strict ATEX regulations and USA market standard.

The plant itself is set to open in the second halve of 2017 and is expected to produce 1,100 kMT/year PET plant and 1,300 kMT/year PTA. All loaded by Veenstra Group loading equipment!

More projects Contact us

The Veenstra Group in numbers

Due to its strategic spread the Veenstra Group is capable of serving the entirety of the Netherlands with speed and easy. For work abroad the group has more then 10 mobile workshops that can be shipped to your plant to perform work on-site.

0
Workshops
0
Employees
0
Service cars
0
Service trucks